Transparency index

Scottish Government FOI releases

22,640releases indexed
40,478attachments found
29.5avg calendar days
8,386partially withheld
2016-06-13oldest in sample
2026-09-02newest in sample

Outcomes

partially withheld 8,386 unclear 7,405 not held 3,239 released 1,581 already published 700 cost limit 627 clarification 372 withheld 249 transferred 81

Top Exemptions

Timeline

2026-09 1 2026-08 299 2026-07 476 2026-06 1 2026-05 410 2026-04 312 2026-03 217 2026-02 589

Directorate Profiles

Clear
2,344 matching releases

M74 off slip junction 9, route-based weather forecasts: EIR release

• All weather forecast data held for the period 0000 hours on 23 January to 1200 hours on 25 January for the above location (M74 off slip, junction 9). This should include (if available), but not limited to, textural information for each day and indications of whether they are route-based forecasts for the road concern...

FOI/EIR partially withheld 90 score 19 working days correspondence s.20 s.39(2) s.6(1) 4 attachments
Published
2019-11-04
Reference
FOI/19/02282
Directorate
Topic
Public sector, Transport

Perth and Kinross Council 'Main Issues Report - Local Development Plan' correspondence: EIR release

“I refer to a document produced by Perth and Kinross Council entitled 'Main issues Report - Local Development Plan' dated September 2010 which is available to view and download at the following web address: https://www.pkc.gov.uk/media/3634/Main-Issues-Report/pdf/MIR_for_publication_updated_small.pdf?m=6360996740557000...

FOI/EIR partially withheld 90 score 17 working days correspondence meetings s.20 s.39(2) s.11(2) s.11(3) 4 attachments
Published
2019-10-31
Reference
FOI/19/02262
Directorate
Topic
Public sector, Transport

Cost of traffic light installation at Old Craighall Junction: EIR release

You asked for the cost of the recent works to install traffic lights to Old Craighall Junction, the intersection of the A720 and A1. As the information you have requested is ‘environmental information’ for the purposes of the Environmental Information (Scotland) Regulations 2004 (EIRs), we are required to deal with yo...

FOI/EIR partially withheld 65 score 18 working days correspondence spending s.20 s.39(2)
Published
2019-10-25
Reference
FOI/19/02248
Directorate
Topic
Public sector

A725 Eastbound - road surface, road maintenance policy and repair history: EIR release

You asked for “1. All third party notifications, reports received via whatever medium regarding the poor state of the road surface or defects on the A725 Eastbound from the dates 27/05/2018 to the 27/05/2019. 2. A copy of your current road maintenance policy relating to that road. Please send me the full policy, but ...

FOI/EIR partially withheld 90 score 9 working days correspondence contracts s.20 s.39(2) s.11(2) s.34(1) s.6(1) 6 attachments
Published
2019-10-25
Reference
FOI/19/02313
Directorate
Topic
Public sector, Transport

Risk posed by Scottish burial sites of BSE infected carcasses correspondence: EIR release

You asked for internal and external government communication relating to the risk posed by Scottish burial sites of BSE infected carcasses. Risk meaning information relating to potential adverse consequences; including but not limited to the perceived likelihood that prions could have entered Scottish watercourses and ...

FOI/EIR partially withheld 90 score 21 working days over deadline correspondence s.20 s.39(2) s.11(2) s.34(1) 4 attachments
Published
2019-10-23
Reference
FOI/19/02183
Directorate
Agriculture and Rural Economy Directorate
Topic
Farming and rural, Public safety and emergencies, Public sector

Inspection and maintenance records for A9 Perth to Inverness Road: EIR release

We make a request under the Freedom of Information (Scotland) Act 2002 for copy inspection and maintenance records for A9 Perth to Inverness Road, more specifically 200 metres both north and south of the Kindallachan junction, Ballinluig, Perthshire for a period commencing 3 years prior to the date of the above acciden...

FOI/EIR partially withheld 90 score 15 working days correspondence s.20 s.39(2) 2 attachments
Published
2019-10-23
Reference
FOI/19/02240
Directorate
Topic
Public sector, Transport

Origin and source of a seed stock of Cara potatoes: EIR release

You asked for the origin and seed stock of crop 103306. Further to this, you asked for a breakdown of seed labels issued for crop 103306.

FOI/EIR partially withheld 65 score 7 working days correspondence s.20 s.39(2) s.10(5)
Published
2019-10-10
Reference
FOI/19/02219
Directorate
Topic
Public sector

A830 Kinlochiel and Glenfinnan defect report NW345 14366-236805981: EIR release

1.Information relating to defect report NW345 14366-236805981 on the A830 between Kinlochiel and Glenfinnan between 1 May 2018 and 25 June 2019. In particular any written or electronic communication and records detailing: 2. The identification of the defect report 3.The categorisation of the defect under the 4th Genera...

FOI/EIR partially withheld 90 score 17 working days correspondence contracts s.20 s.39(2) s.6(1) 2 attachments
Published
2019-10-10
Reference
FOI/19/02122
Directorate
Topic
Public sector, Transport

Questions about double red lines on the Trunk Road Network: EIR release

1. How many miles of road under your jurisdiction currently have double red lines/are classified as red routes? 2. How many miles of road under your jurisdiction had double red lines/been classified as red routes in September 2018, September 2017, September 2016, and September 2015? 3. Do you currently have any plans...

FOI/EIR partially withheld 65 score 12 working days correspondence s.4 s.20 s.39(2) s.2 s.10(4)
Published
2019-10-04
Reference
FOI/19/02126
Directorate
Topic
Public sector, Transport

Phase 2 of the Bus Abatement Retrofit Programme (BEAR) scheme: EIR release

You asked for the following information on Phase 2 of the Bus Abatement Retrofit Programme (BEAR) scheme. Specifically: 1. All correspondence between Transport Scotland and Energy Saving Trust regarding views expressed by specific bus operators on the phase 2 of the bus emissions abatement retrofit programme and probl...

FOI/EIR partially withheld 90 score 121 working days over deadline correspondence ministers s.20 s.39(2) s.11(2) 8 attachments
Published
2019-10-03
Reference
FOI/19/01070
Directorate
Topic
Public sector, Transport

Local Rail Development Fund offer and rejection correspondence: EIR release

You asked for copies of all the offer and rejection letters for applications to the 2019 Local Rail Development Fund, including the annexes providing further information on the decision.

FOI/EIR partially withheld 90 score 14 working days correspondence s.20 s.39(2) s.38(1) s.34(1) 2 attachments
Published
2019-09-26
Reference
FOI/19/02022
Directorate
Topic
Public sector, Transport

A96 Dualling East of Huntly to Aberdeen Scheme: dualling at Inverurie: EIR release

“Under the terms of the Freedom of Information (Scotland) Act 2002 and the Environmental Information (Scotland) Regulations 2004 please could you supply me with all and any information, minutes of meetings, emails, materials (including, but not limited to, reports and including the dates on which data/information were/...

FOI/EIR partially withheld 90 score 20 working days correspondence meetings contracts s.20 s.39(2) s.11(2) s.34(1) 24 attachments
Published
2019-09-26
Reference
FOI/19/02011
Directorate
Topic
Public sector, Transport

West Loch Lomond Cycle Path between Luss and Inverbeg maintenance: EIR release

You asked for “We are making a request under the above Act for information relating to procedures in place for maintaining and inspecting the West Loch Lomond Cycle Path between Luss and Inverbeg. Information including sight of any written or electronic communication, detailing all accidents which have been reported t...

FOI/EIR partially withheld 90 score 19 working days correspondence ministers contracts s.20 s.39(2) s.10(4) s.3 2 attachments
Published
2019-09-26
Reference
FOI/19/02038
Directorate
Topic
Public sector, Transport

M8, M73 and M74 Motorways Improvement project: EIR release

All information on the integrity or safety of central reservation barriers on sections of the M8 motorway not upgraded by the M8, M73 and M74 Motorways Improvement project in the last five years. This should include any routine examination reports which suggest the need for improvement and / or replacement. Any further...

FOI/EIR partially withheld 90 score 41 working days over deadline correspondence contracts s.20 s.39(2) s.10(5) s.11(2) s.34(1) 2 attachments
Published
2019-09-25
Reference
FOI/19/01837
Directorate
Topic
Public sector, Transport

M8 West Bound J2 Slip Road - maintenance and road repair history: EIR release

“I am writing to request information under the Freedom of Information Act relating to a road your authority is responsible for maintaining. Specifically, my query relates to the M8 West Bound J2 Slip Road. Please can you send me: 1. A copy of your current road maintenance policy relating to that road. Please send me t...

FOI/EIR partially withheld 90 score 29 working days over deadline correspondence ministers contracts s.20 s.39(2) s.11(2) s.34(1) 8 attachments
Published
2019-09-23
Reference
FOI/19/01999
Directorate
Topic
Public sector, Transport

Extension of the Borders Railway - correspondence and documentation: EIR release

You asked for “any correspondence between the UK Government and the Scottish Government regarding a feasibility study for the extension of the Borders Railway and any documentation which the Scottish Government or Transport Scotland holds regarding a feasibility study on the extension for the Borders Railway”

FOI/EIR partially withheld 90 score 20 working days correspondence ministers s.20 s.39(2) s.10(4) s.10(5) s.11(2) s.34(1) 4 attachments
Published
2019-09-19
Reference
FOI/19/01980
Directorate
Topic
Public sector, Transport

Resurfacing carried out on A83 at Holmlea, Kilkenzie questions: EIR release

You asked for: "In November 2015 resurfacing was carried out on A83 at Holmlea, Kilkenzie, Campbeltown, PA28 6QD. Please can you advise: 1. What notice was given to the residents of the A83 in Kilkenzie for the planning for the resurfacing of the road in November 2015. If so, please provide a copy. 2. What considerat...

FOI/EIR partially withheld 90 score 20 working days correspondence s.20 s.39(2) s.11 s.34(1) 8 attachments
Published
2019-09-18
Reference
FOl/19/02073
Directorate
Topic
Public sector, Transport

Further questions on FOI/19/01512: EIR release

1. I am not able to read the information on the photographs including the dates on Annex B Additional Photos. Could a further copy be sent which is clearer? 2. On Annex A - I can't see any details of the temporary repair carried out for defect NW34474665-236531691. Are there details and records of the temporary repair...

FOI/EIR partially withheld 90 score 19 working days correspondence s.20 s.39(2) s.11 s.34(1) s.2 4 attachments
Published
2019-09-17
Reference
FOI/19/02004
Directorate
Topic
Public sector, Transport

Licences granted to stock non-native species into inland waters: EIR release

You asked for all information or licences granted to stock non-native species into inland waters over the past 5 years.

FOI/EIR partially withheld 90 score 9 working days correspondence s.20 s.39(2) 2 attachments
Published
2019-09-13
Reference
FOI/19/02103
Directorate
Marine Directorate
Topic
Marine and fisheries, Public sector

SGRPID payments and complaints procedure: EIR release

1. Full reasoning as to why after three years the 2016 claim has still not been paid and why even at this late stage a payment date cannot be provided. 2. Full details of all available complaints procedures, including any provided by the EU, SGRIPD, RPA or the Scottish Government. 3. Copies of all correspondence, int...

FOI/EIR partially withheld 65 score 23 working days over deadline correspondence ministers spending s.20 s.39(2) s.2
Published
2019-09-09
Reference
FOI/19/01903
Directorate
Agriculture and Rural Economy Directorate
Topic
Public sector

Aberdeen Western Peripheral Route, payments and expected payments: EIR release

1) Details of the full amount of money paid to date to the Aberdeen Roads Ltd consortium in relation to the contract for the Aberdeen Western Peripheral Route (AWPR), including dates and values for each payment made in 2019. 2) Details of any payments made to any other bodies in relation to the AWPR contract in 2018 an...

FOI/EIR partially withheld 90 score 20 working days correspondence ministers contracts spending s.3 s.20 s.39(2) s.6(1) 2 attachments
Published
2019-09-06
Reference
FOI/19/01902
Directorate
Topic
Public sector, Transport

A725 maintenance policy and road repair history: EIR release

“I am writing to request information under the Freedom of Information Act relating to a road your authority is responsible for maintaining. Specifically, my query relates to the A725 Heading away from East Kilbride around the Blantyre area. Please see page 2 off approximately area of the damaged road now been repaired ...

FOI/EIR partially withheld 90 score 12 working days correspondence ministers contracts s.20 s.39(2) s.6(1) 4 attachments
Published
2019-09-05
Reference
FOI/19/01965
Directorate
Topic

Plan and profile of Pink Route in A96 Dualling East project: EIR release

“Under the terms of the Freedom of Information (Scotland) Act 2002 and the Environmental Information (Scotland) Regulations 2004 please could you supply me with all and any information, data, correspondence etc that AmeyArup have in relation to the Plan and Profile of the entire length of the Pink Route identified in t...

FOI/EIR partially withheld 65 score 11 working days correspondence s.20 s.39(2) s.10(4)
Published
2019-09-03
Reference
FOI/19/01961
Directorate
Topic
Public sector, Transport

Number of claims made by the public on roads A77/A76/A75 between 2008 and 2018 and the number successful: EIR release

The number of claims made by the public on Scotland Transerv for the A77, A76, A75. Since 2008 to 2018, in addition the number of successful claims for A77, A76, A75 over the same time period. As the information you have requested is ‘environmental information’ for the purposes of the Environmental Information (Scotla...

FOI/EIR partially withheld 65 score 18 working days correspondence contracts s.20 s.39(2)
Published
2019-09-02
Reference
FOI/19/01896
Directorate
Topic
Public sector, Transport

Electric vehicle charging network points installation and investment: EIR release

How much has been invested in building Scotland’s electric vehicle charging network in each of the past five years? In each of those years, how much was spent in each local authority area? In each of those years, how many charging points were installed in each local authority area, and how many of those were (i) fast c...

FOI/EIR partially withheld 90 score 18 working days correspondence contracts s.20 s.39(2) 2 attachments
Published
2019-08-30
Reference
FOI/19/01756
Directorate
Topic