Transparency index

Scottish Government FOI releases

22,640releases indexed
40,478attachments found
29.5avg calendar days
8,386partially withheld
2016-06-13oldest in sample
2026-09-02newest in sample

Outcomes

partially withheld 8,386 unclear 7,405 not held 3,239 released 1,581 already published 700 cost limit 627 clarification 372 withheld 249 transferred 81

Top Exemptions

Timeline

2026-09 1 2026-08 299 2026-07 476 2026-06 1 2026-05 410 2026-04 312 2026-03 217 2026-02 589

Directorate Profiles

Clear
279 matching releases

Clyde road bridge in Wandel: EIR release

Information relating to Clyde Road Bridge in Wandel. In particular, we require the following information: 1. Information including sight of any written or electronic communication detailing maintenance and inspection records. 2. Information including sight of any written or electronic communication detailing the rem...

FOI/EIR partially withheld 90 score correspondence s.2 s.3 s.6 s.20 s.39(2) s.11(2) 20 attachments
Published
2017-10-03
Reference
Directorate
Topic
Public sector, Transport

Inspection logs for A75 Annan Road towards Dumfries: EIR release

Inspection, maintenance and repair logs/notes and any other relevant documentation for the A75 Annan Road towards Dumfries, specifically the slip road to turn into Shell Collin Service, for the period covering 31 January 2015 to 31 January 2017; and details of the system used to identify and subsequently repair road de...

FOI/EIR partially withheld 90 score correspondence contracts s.20 s.39(2) s.2 s.3 s.5 s.10(4) 4 attachments
Published
2017-08-14
Reference
Directorate
Topic
Public sector, Transport

Information on safety inspections of A82 in 2017: FOI release

Information on safety inspections (how and when) of the A82 from the 4th January 2017 – 4th of July 2017 Information on when maintenance was last done on the following stretch of road and reports of potholes/areas of road surface missing: A82 from Inveruglas going north for five miles to ensure I have the information I...

FOI/EIR partially withheld 90 score correspondence contracts s.20 s.39(2) s.2 s.3 s.5 2 attachments
Published
2017-08-08
Reference
Directorate
Topic
Public sector, Transport

EIA regulations: EIR release

1) Any Scoping determination, and the associated scoping application, prepared under the EIA regulations for these developments.2) Any transport assessment prepared for these development.3) The agreed transport or traffic management plan for these developments.4) The name of the agencies involved in preparing and agree...

FOI/EIR partially withheld 90 score correspondence s.2 s.4 s.10(4) s.3 6 attachments
Published
2017-07-11
Reference
Directorate
Energy and Climate Change Directorate
Topic
Environment and climate change, Public sector