Transparency index

Scottish Government FOI releases

21,792releases indexed
39,278attachments found
29.7avg calendar days
8,073partially withheld
2016-06-13oldest in sample
2026-05-15newest in sample

Outcomes

partially withheld 8,073 unclear 7,195 not held 3,052 released 1,533 already published 668 cost limit 605 clarification 348 withheld 241 transferred 77

Top Exemptions

Timeline

2026-05 339 2026-04 312 2026-03 217 2026-02 589 2026-01 479 2025-12 177 2025-11 263 2025-10 217

Directorate Profiles

Clear
104 matching releases

Meall Mhor fish farm: EIR release

Information concerning a disclosure made to Scottish Government relating to a possible offence under the Aquaculture and Fisheries (Scotland) Act 2007 at Meall Mhor fish farm. Specifically: 1. Was the disclosure notified to others within Marine Scotland and the Scottish Government? Please set out the positions held o...

FOI/EIR clarification 80 score 38 working days over deadline correspondence meetings s.20 s.39(2) s.10(4) s.9 s.6(1) s.11(2) s.34(1) 2 attachments
Published
2021-08-25
Reference
FOI/202100216680
Directorate
Marine Directorate
Topic
Marine and fisheries, Public sector

Information relating to stopping up orders hearing: EIR release

You asked "please issue the SU-ABS-002 & -003 hearing report to me, the other participants and the public, so that we can implement action of the planning condition that has been held up pending the issue of the report."

FOI/EIR clarification 55 score 16 working days correspondence ministers s.20 s.39(2) s.10(4) s.42
Published
2021-03-09
Reference
FOI/202100137883
Directorate
Topic
Building, planning and design, Public sector, Transport

Marine fish farm at Carradale North: EIR release

Information relating to the marine fish farm situated at Carradale North, with reference to the recent escape event occurring in August 2020. Specifically, you asked for the following with reference to ‘applications to Marine Scotland’ in relation to the specifications (of the mooring ropes and system) given by the app...

FOI/EIR clarification 80 score 40 working days over deadline correspondence meetings s.20 s.39(2) s.10(4) s.11(2) s.34(1) 2 attachments
Published
2020-12-16
Reference
FOI/202000080506
Directorate
Topic
Marine and fisheries, Public sector

Salmon and sea trout catches - Sgitheach and Allt Graad, Evanton: EIR review

Under the section of your response entitled "Information Regarding Fisheries on the Rivers Sgitheach and Allt Graad" I would like clarification on the following points: Paragraph 1. Sentence 1: Do the "7 catch forms" to which you refer relate to individual returns for various reparian owners with fishing rights on the...

FOI/EIR clarification 55 score 19 working days correspondence s.20 s.11(2) s.34(1) s.10(4) s.4
Published
2020-11-06
Reference
FOI/202000087750
Directorate
Marine Directorate
Topic
Marine and fisheries, Public sector

A75 and A77 closures: EIR release

"how many times has the A77 and A75 have been closed with diversions in place over the past five years, and to date this year. With the reason why for the closure and what was the official diversion route given?" Following clarifications you reduced the scope of your request to cover the financial years of 2017/18, 201...

FOI/EIR clarification 80 score 17 working days correspondence s.20 s.39(2) s.15 s.10(4) s.11(2) s.34(1) 10 attachments
Published
2020-09-14
Reference
FOI/202000066548
Directorate
Topic
Public sector, Transport

A78 Bridge 1 High Street, Greenock correspondence: EIR release

"documentation and correspondence relating to the following: (a) the date on which the two outside lanes of highway over the Bridge were closed; (b) the purpose of the closure of two lanes of the highway over the Bridge." Further to the clarification dated 15 June, you confirmed that "the period of lane closure is the ...

FOI/EIR clarification 80 score 43 working days over deadline correspondence ministers briefings meetings contracts s.20 s.39(2) s.10(4) 2 attachments
Published
2020-09-02
Reference
FOI/202000045365
Directorate
Topic
Public sector, Transport

Field trials of Imidacloprid (Ectosan/BMK08) by the salmon farming industry: EIR release

1) ‘..details on any proposed, in progress and completed field trials of Imidacloprid (Ectosan/BMK08) by the salmon farming industry in Scotland since 2017.’ You further qualified this part of your request by stipulating that this ‘would involve documentation pertaining to any field trials - however illegal, unsanction...

FOI/EIR clarification 80 score 55 working days over deadline correspondence ministers briefings s.20 s.39 s.10(4) s.6(1) s.11(2) s.34(1) 2 attachments
Published
2020-09-01
Reference
FOI/202000038615
Directorate
Marine Directorate
Topic
Marine and fisheries, Public sector

National Highways Sector Schemes (NHSS) contractor compliance: EIR release

"1. Do Transport Scotland, or its contractors, have the means to check and record a contractor's compliance with the National Highways Sector Schemes before and after award of contract? If so, would it be possible to give us the following information: 2. Details of all contracts awarded on behalf of each Transport Sco...

FOI/EIR clarification 80 score 21 working days over deadline correspondence contracts spending s.6 s.20 s.39(2) s.10(4) s.4 4 attachments
Published
2020-06-03
Reference
FOI/202000020273
Directorate
Topic
Public sector, Transport, Work and skills

Motorist claims & outcomes of vehicle damage sustained from A725 potholes: EIR release

Claims submitted for road defects along the A725 to maintainers Scotland Transerv, particularly from the Wraith interchange join, along with their outcome." Further clarification confirmed that you were "looking for claims and their outcomes made by motorists for vehicle damage caused by potholes across roads maintaine...

FOI/EIR clarification 80 score 12 working days correspondence ministers s.20 s.39(2) s.10(4) 10 attachments
Published
2020-03-19
Reference
FOI/202000018645
Directorate
Topic
Public sector, Transport

M80 various questions: EIR release

"1. Confirmation of which organisation is in control of the M80. 2. Any details held pertaining to road traffic accidents that occurred between junctions 7 and 9 from February 2017 to date. 3. Any complaints that are held about the surface water between junctions 7 and 9 from 1 February 2017 to date. 4. Information abo...

FOI/EIR clarification 80 score 16 working days correspondence contracts s.20 s.39(2) s.11(2) s.34(1) s.6(1) s.10(4) 6 attachments
Published
2020-03-18
Reference
FOI/202000017685
Directorate
Topic
Public sector, Transport

A82 at Bowling Roundabout inspection reports: EIR release

You asked for "I would request that under FOI you furnish me with all information/complaints relating to the A82 at Bowling Roundabout which reported damage to the road surface from 1st January 2020 up to the date of the incident" A further clarification confirmed that you would like: "1. All reports from members of ...

FOI/EIR clarification 80 score 10 working days correspondence s.20 s.39(2) s.10(4) s.3 2 attachments
Published
2020-03-02
Reference
FOI/202000016192
Directorate
Topic
Public sector, Transport

Road studs - North West unit; defective, replacements and resurfaced numbers: EIR release

You asked for: "As a regular user of the trunk roads i would like information on road studs and road stud defects on the network particularly northwest unit. How many defective road studs are there per route? please can you provide numbers per route over the last 3 year inspection data How many road stud schemes have...

FOI/EIR clarification 55 score 14 working days correspondence s.20 s.39(2) s.10(4)
Published
2020-02-21
Reference
FOI/202000013309
Directorate
Topic
Public sector, Transport

A90 Foveran culvert maintenance records, construction drawings and correspondence: EIR release

You asked for “Construction drawings for the replacement culvert and associated works at Foveran (Old A90) which commenced on 2 September 2019. Proposed embankment repairs at the corner of Blairythan Terrace/old A90. Maintenance records for the A90 Foveran culvert between September 2009 and January 2016. Copy of th...

FOI/EIR clarification 80 score 28 working days over deadline correspondence meetings contracts spending s.20 s.39(2) s.11(2) s.34(1) s.10(5) s.3 s.10(4) s.6(1) s.11(1) 10 attachments
Published
2020-02-17
Reference
FOI/20/00062
Directorate
Topic
Public sector, Transport

Salmon Ova imports data: EIR release

Ova import data since the last import detailed in the information disclosed today via FOI/18/01553 (i.e. data since 8 June 2018) including data on Scottish Sea Farms. Ova import data for 2016 (as previously requested and disclosed except for Scottish Sea Farms via FOI/18/02912). Information in relation to discussions r...

FOI/EIR clarification 80 score 44 working days over deadline correspondence ministers briefings meetings s.20 s.39(2) s.6(1) s.11(2) s.34(1) s.10(4) 8 attachments
Published
2020-02-17
Reference
FOI/19/02663
Directorate
Marine Directorate
Topic
Marine and fisheries, Public sector

M8 M73 M74 Motorway Improvements Project planned SUDS ponds: EIR release

There were a number of SUDS ponds planned as part of the above project. I require information about these ponds. Specifically I would like information on. 1. How many of the SUDS ponds which were proposed have either been cancelled, relocated, scaled down, scaled up, or had any other significant change made to them. Th...

FOI/EIR clarification 55 score 10 working days correspondence contracts s.20 s.39(2) s.10(4)
Published
2020-01-21
Reference
FOI/19/02411
Directorate
Topic
Public sector, Transport

The Scottish Borders Railway Line evaluation reports and projections: EIR release

You asked for: A Scotsman report on the recent AGM of the Campaign for Borders Rail quoted a Transport Scotland spokesperson as saying: “The Borders Railway has been a phenomenal success as it continues to grow……………..communities along its length” 1. Please provide empirical evidence to support these assertions. 2. P...

FOI/EIR clarification 55 score 32 working days over deadline correspondence contracts s.2 s.20 s.39(2) s.10(4)
Published
2020-01-09
Reference
FOI/19/02392
Directorate
Topic
Business, industry and innovation, Public sector, Transport

M8, M73, M74 noise assessments: EIR release

[redacted] has been provided with the attached M73 M74 Upgrade Noise Assessments and the data is of interest to him, and he presumes yourselves. [redacted] would be grateful if you could furnish him with a comparative Noise Surveying data from the same time frame. Following receipt of the clarification received on 30...

FOI/EIR clarification 55 score 24 working days over deadline correspondence contracts s.19 s.10(4)
Published
2019-12-02
Reference
FOI/19/02379
Directorate
Topic
Public sector, Transport

Developers appealed planning decisions with local council questions: EIR release

1. How many times have developers appealed planning decisions by local councils to the Scottish Government, since 1999? Please break down your response by council area, and calendar year. 2. How many times, again broken down by council area and by year, has the Scottish Government ruled in favour of developers appeali...

FOI/EIR clarification 80 score 28 working days over deadline correspondence spending s.20 s.39(2) s.10(4) 2 attachments
Published
2019-11-15
Reference
FOI/19/02196
Directorate
Constitution Directorate
Topic
Building, planning and design, Public sector

Forth Road Bridge risk assessments and suicide related questions: EIR release

“1. Details of risk assessments that have been undertaken in regards to suicides and attempted suicides on the Forth Road Bridge from 1999 to date. 2. Details of installations, maintenance repairs and alterations that have been undertaken to the Forth Road Bridge since 1 September 1999 in relation to or in response to...

FOI/EIR clarification 55 score 22 working days over deadline correspondence meetings s.3 s.20 s.39(2) s.10(4) s.7
Published
2019-10-17
Reference
FOI/19/02080
Directorate
Topic
Public sector, Transport

Erskine Bridge risk assessments and suicide related questions: EIR release

You asked “We would be grateful if you could provide us with the following information about the Erskine Bridge: 1. Details of risk assessments that have been undertaken in regards to suicides and attempted suicides on the Erskine Bridge from 1999 to date. 2. Details of installations, maintenance repairs and alterati...

FOI/EIR clarification 55 score 28 working days over deadline correspondence meetings spending s.3 s.10(4) s.2 s.7
Published
2019-10-17
Reference
FOI/19/02081
Directorate
Topic
Public sector, Transport

Document 'Online at Inverurie – Dualling Feasibility and Appraisal' questions: EIR review

Thank you for your e-mail dated 31 July 2019 requesting an internal review of the response to your request for information, which was dealt with under the Environmental Information (Scotland) Regulations 2004 (EIRs), pertaining to Document Title : Online at Inverurie – Dualling Feasibility and Appraisal (A96PEA-AMAR-GE...

FOI/EIR clarification 55 score 43 working days over deadline correspondence contracts s.20 s.39(2) s.10(4)
Published
2019-09-11
Reference
FOI/19/01550 Review
Directorate
Topic
Public sector, Transport

Operation of the traffic lights at specified location: EIR release

I would like to request under the Freedom of Information (Scotland) Act 2002 (FOISA) for; 1. A copy of the light sequencing for the traffic lights at this location on 8 December 2018. 2. The date on which the traffic lights at this location were installed, and 3. Any complaints made about the operation of the traffic ...

FOI/EIR clarification 80 score 22 working days over deadline correspondence contracts s.20 s.39(2) s.10(4) 2 attachments
Published
2019-08-26
Reference
FOI/19/01804
Directorate
Topic
Public sector, Transport

Transport Scotland - Incidents at various sites: EIR release

Under the Freedom of Information Act (2002), I wish to acquire the following information: Reported (a) accidents and (b) incidents, broken down by (i) near miss and (ii) undesired circumstance reported on the following projects: • M8 Motorway Improvements • M73 Motorway Improvements • M74 Motorway Improvements • Forth...

FOI/EIR clarification 55 score 28 working days over deadline correspondence contracts s.20 s.39(2) s.10(4)
Published
2019-08-23
Reference
FOI/19/01818
Directorate
Topic
Transport, Transport

Marine Scotland - Wild salmonid locational guidance and information: EIR release

You asked for the following information – Copies of powerpoint presentations presented to you by Marine Scotland Science staff on the 18th April 2019. All reports on the constraints and opportunities project sent to or presented by MSS to the Scottish Government’s aquaculture technical working group, and by MSS to the...

FOI/EIR clarification 55 score 40 working days over deadline correspondence meetings s.20 s.39(2) s.10(4) s.4 s.11(2) s.34(1)
Published
2019-08-02
Reference
FOI/19/01408
Directorate
Marine Directorate
Topic
Marine and fisheries, Public sector

Traffic modelling data, analysis/reports used in A96 duallling project: EIR release

Traffic modelling data, analysis and reports (resulting from the A96 Corridor Road Assignment Model (CRAM) traffic model) being used in the A96 Duallling East of Huntly to Aberdeen scheme.

FOI/EIR clarification 55 score 21 working days over deadline correspondence s.20 s.39(2) s.10(4)
Published
2019-06-06
Reference
FOI/19/01211
Directorate
Topic
Environment and climate change, Public sector, Transport