Road maintenance policy and repair history for A77: EIR release
- Published
- 2018-11-20
- Reference
- Directorate
- Topic
- Public sector, Transport
Transparency index
1. What work was carried out on the southbound carriageway of the M74 at junction 6 between the second and ninth of March 2018. 2. How many claims for damage to vehicles, including tyres were received relating to the same junction between the second and ninth of March 2018. 3. A schedule of repairs carried out on Jun...
1. Copy of inspection report on M8 at Kingston Bridge carried out on 6/2/18 by Scotland Transerv. 2. Details of how inspection was carried out (ie on foot or in moving vehicle). 3. If inspection was carried out from a moving vehicle, which lane and what speed was the vehicle travelling in. 4. The weather condition a...
1. All internal SGRIPD correspondence pertaining to Auchencheyne Ltd, Auchencheyne, Moniaive, Dumfries DG3 4EW, their representatives or their directors. 2. Any correspondence between SGRID and BCMS relating to Auchencheyne Ltd, Auchencheyne, Moniaive, Dumfries DG3 4EW their representatives or their directors. 3. All...
The ministerial diary for Mike Russell for when he was in Ireland from 24 to 25 November including engagements and who he met with; I would also like to ask for his personal costs associated with the visit and for any staff who accompanied him; for correspondence on the trip and for the job titles of the staff that acc...
Information relating to a road Scotland TranServ is responsible for maintaining. Specifically, relating to the A77 on the section between Girvan and Dipple. Please can you provide: 1. A copy of your current road maintenance policy relating to that road. Please send me the full policy, but this should include details ...
The following information in relation to Precision Medicine Ecosystem Investment £4m 2015/2016: 1. When was the first meeting regarding this proposal and who attended? 2. List any subsequent meetings that were held with attendees. 3. When did you receive the first written proposal? 4. How, who and when was it revie...
The 'Regulatory Impact Assessment of Proposals for Flood Risk Management (Scotland) Bill' published on 3 September 2008 advises at Section 3, 3.4 and 3.5 that a consultation document was released in 2007 and had a response from 145 organisations. I have been unable to locate these on your website and I would therefore...
1) A copy of your current road maintenance policy relating to the A702 (Wandel Area). Please send me the full policy, but this should include details of the intended frequency of road safety inspections, how these inspections should be conducted and the maximum time between identification of a defect and repairs being ...
The 'Regulatory Impact Assessment of Proposals for Flood Risk Management (Scotland) Bill' published on 3 September 2008 advises at Section 3, 3.4 and 3.5 that a consultation document was released in 2007 and had a response from 145 organisations. I have been unable to locate these on your website and I would therefore...
Information relating to a road your authority is responsible for maintaining. Specifically, my query relates to the M8 heading west bound between junctions 16 and 17. 1. A copy of your current road maintenance policy relating to that road. Please send me the full policy, but this should include details of the intended...
Can you provide copies of inspections since Christmas, what defects were noted and associated repair programme for these (for both the A77 and the DBFO company). Who oversees the governance of this and ensure the correct action being taken.
I request information under the Freedom of Information Act relating to a road your authority is responsible for maintaining. Specifically, my query relates to the A77 just outside the town of Maybole, South Ayrshire as per highlighted section below. Please can you send me the following information: 1. A copy of your...
'I am writing to request information under the Freedom of Information Act relating to the A76 road between Auchinleck and Mauchline; A copy of your current road maintenance policy relating to that road. Please send me the full policy, but this should include details of the intended frequency of road safety inspections...
A copy of the road report for the M8 near Charing Cross for the date range of 24 to 26 February 2018. A copy of the road maintenance policy which outlines the timeframe of when potholes should be fixed.