Transparency index

Scottish Government FOI releases

21,864releases indexed
39,478attachments found
29.7avg calendar days
8,113partially withheld
2016-06-13oldest in sample
2026-06-12newest in sample

Outcomes

partially withheld 8,113 unclear 7,200 not held 3,069 released 1,537 already published 671 cost limit 607 clarification 349 withheld 241 transferred 77

Top Exemptions

Timeline

2026-06 1 2026-05 410 2026-04 312 2026-03 217 2026-02 589 2026-01 479 2025-12 177 2025-11 263

Directorate Profiles

Clear
1,987 matching releases

Breakdown of accidents on A90 from January 2017: EIR release

Details of the number of fatalities and accidents on the A90 Perth to Dundee road over the last three years, including a breakdown of where these took place and when? Can you also please provide details of when the last safety road audit of the A90 Perth to Dundee road was carried out by the Scottish Government? You al...

FOI/EIR not held 70 score 7 working days correspondence s.20 s.39(2) s.10(4) 2 attachments
Published
2021-04-20
Reference
FOI/202100172252
Directorate
Topic
Public sector, Transport

United states of America Marine Mammal Protection Act Import Provisions communication: EIR release

Please assist me by identifying and supplying electronic copies of any such comparability finding request in draft or final form, or which has been sent to the US authorities by the UK or Scottish Governments. Please also assist me by identifying and supplying electronic copies of correspondence between Scottish Govern...

FOI/EIR not held 70 score 20 working days correspondence briefings meetings s.20 s.39(2) s.6(1) s.10(4) s.11(2) s.34(1) s.10 4 attachments
Published
2021-04-19
Reference
FOI/202100152459
Directorate
Marine Directorate
Topic
Marine and fisheries, Public sector

Speed limit and activated halt signals at Springholm: EIR release

1. We wish to know the intended duration of the trial of the experimental speed activated traffic halt signals on main street Springholm and if a trial conclusion date has been set. 2. We wish to know the methodology by which it is proposed to evaluate the success of the these experimental speed activated traffic halt ...

FOI/EIR not held 70 score 19 working days correspondence ministers spending s.3 s.5 s.7 s.20 s.39(2) s.10(4) 2 attachments
Published
2021-04-12
Reference
FOI/202100161024
Directorate
Topic
Public sector, Transport

Low Carbon Infrastructure Transition Programme (LCITP) performance and evaluation reports: FOI release

Reports or documents which summarise the performance of the Low Carbon Infrastructure Transition Programme (LCITP), evaluate it or report its outcomes. You wanted information including: how many of the projects supported by the programme were able to progress to completion (e.g.investment in infrastructure) estimates ...

FOI not held 70 score 20 working days correspondence s.10(4) 2 attachments
Published
2021-04-12
Reference
FOI/202100160848
Directorate
Energy and Climate Change Directorate
Topic
Energy, Public sector

Development information regarding former Cockenzie power station site: EIR release

Recorded information held by your organisation that relates to the development of the former Cockenzie power station site with regard to early proposals from the organisations named in this news report: https://www.eastlothiancourier.com/news/18881072.green-energy-project-proposed-former-cockenzie-power-station-site/ T...

FOI/EIR partially withheld 90 score 42 working days over deadline correspondence s.20 s.39(2) s.11(2) s.34(1) s.10(4) 2 attachments
Published
2021-03-31
Reference
FOI/202000113641
Directorate
Topic
Building, planning and design, Environment and climate change, Public sector

Strategic investment in zero or low emission buses: EIR release

The Scottish Government stated in its programme for government on 1 September that in the lead up to the Scottish National Investment Bank launch, engagement is underway with bus operators on options to support the net-zero transition. I would like to request all information that the government holds relating to this e...

FOI/EIR partially withheld 90 score 92 working days over deadline correspondence s.20 s.39(2) s.11(2) s.34(1) s.10(4) s.10(5) 2 attachments
Published
2021-03-29
Reference
FOI/202000094606
Directorate
International Trade and Investment Directorate
Topic
Environment and climate change, Public sector

Minister for Local Government, Housing and Planning cladding information: EIR release

From 1 June 2020 to present: Copies of all correspondence (emails, texts, briefings, minutes of meetings, minutes of calls, memos and/or otherwise) between civil servants, Special Advisors and Housing Minister Kevin Stewart regarding a cladding fund and/or banning combustible cladding.

FOI/EIR partially withheld 90 score 30 working days over deadline correspondence ministers briefings meetings s.20 s.39(2) s.10(4) s.11(2) s.34(1) 2 attachments
Published
2021-03-29
Reference
FOI/202100145113
Directorate
Topic
Housing, Public sector

Tarbolton Landfill Site: EIR release

1. Information contained in copies of correspondence (including emails), internal and external reports, notes of internal and external meetings, and other documentation held by the Scottish Government (SG) in relation to any investigations, risk assessments, remediation strategies, requests for remediation funding or o...

FOI/EIR partially withheld 90 score 39 working days over deadline correspondence ministers meetings contracts s.20 s.39(2) s.11(2) s.34(1) s.10(4) s.10(5) 8 attachments
Published
2021-03-25
Reference
FOI/202100133009
Directorate
Environment and Forestry Directorate
Topic
Environment and climate change, Public sector

Refusal of planning permission for Carnbroe: EIR release

Information related to the proposal for the period between 29 November 2019 and 3 November 2020: (a) all internal communications between Scottish Government officials (b) all communications between officials and Scottish Ministers; (c) all communications between Ministers (c) all notes of meetings (virtual or otherwis...

FOI/EIR partially withheld 65 score 21 working days over deadline correspondence ministers meetings s.11(2) s.34(1) s.10(4)
Published
2021-03-24
Reference
FOI/202000110132
Directorate
Topic
Building, planning and design, Public sector

Scotland Rural Development Program 2007- 2020 information on woodland options: EIR release

I am writing to request information relating to the take up of Scotland Rural Development Program 2007- 2020 options targeted to improve the conditions of juniper populations as outlined in this document https://scotland.forestry.gov.uk/images/corporate/pdf/junipersrdptechnicalnote.pdf. I have identified the following ...

FOI/EIR partially withheld 90 score 15 working days correspondence ministers contracts s.20 s.39(2) s.10(4) 2 attachments
Published
2021-03-23
Reference
FOI/202100152335
Directorate
Topic
Environment and climate change, Farming and rural, Public sector

Collisions on A90 between Northwaterbridge and Stonehaven: EIR release

Information about road traffic collisions which resulted in injury or fatalities on the A90 between Northwaterbridge and Stonehaven for the following time period 1st Jan 2000 to today (4th Feb 2021). For each collision I would like time and date, latitude& longitude or easting & northing, Accident Severity, Accident Ui...

FOI/EIR not held 70 score 11 working days correspondence s.10(4) 2 attachments
Published
2021-03-19
Reference
FOI/202100151303
Directorate
Topic
Public sector, Transport

Correspondence relating to speed restriction within Langholm: EIR release

Please provide copies of any emails, communications, minutes of discussions, speed surveys data or reports both internal and to any external bodies or persons, associated with the setting of 20mph speed limits within Langholm for the period 1st January 2016 to 30th Nov 2020.

FOI/EIR partially withheld 90 score 17 working days correspondence meetings s.20 s.39(2) s.10(4) s.11(2) s.34(1) 4 attachments
Published
2021-03-19
Reference
FOI/202000116465
Directorate
Topic
Public sector, Transport

Tonnage of sediment deposited within specific areas: EIR release

Please provide the following: Tonnage (wet tonnes) of sediment deposited within the areas defined by the following co-ordinates: 1) 56 deg 45.039' N, 002 deg 25.416'W 56 deg 45.017' N, 002 deg 24.139'W 56 deg 42.448' N, 002 deg 26.660'W 56 deg 42.446'N, 002 deg 25.269'W Montrose Bay. 2) Within a circle with a radius of...

FOI/EIR withheld 80 score 27 working days over deadline correspondence s.2 s.10(4) 2 attachments
Published
2021-03-15
Reference
FOI/202100134787
Directorate
Marine Directorate
Topic
Marine and fisheries, Public sector

A828 Benderloch footway redetermination application documents: EIR release

Copies of all documents related to the A828 Benderloch footway 2011 application for redetermination, including any plans which indicate the dimensions of the former footway. Should a Transport Scotland Departure from Standard, retrospective or otherwise, be in place in relation to the above, please furnish full details...

FOI/EIR partially withheld 65 score 22 working days over deadline correspondence meetings s.20 s.39(2) s.11(2) s.34(1) s.10(4)
Published
2021-03-15
Reference
FOI/202000112193
Directorate
Topic
Public sector, Transport

Correspondence relating to A96 dualling Inverness to Aberdeen scheme: EIR release

Please could you supply me with the A96 dualling Inverness to Aberdeen Programme Board meeting minutes, papers and material presented at any such meeting during the period from April 2020 to the current date.

FOI/EIR partially withheld 90 score 24 working days over deadline correspondence meetings s.20 s.39(2) s.11(2) s.34(1) s.10(4) 6 attachments
Published
2021-03-12
Reference
FOI/202000123574
Directorate
Topic
Building, planning and design, Public sector, Transport

Scottish fishing farm industry financial support: EIR release

Details of financial support by way of (i) grants and (ii) loans, paid to the Scottish fish farming industry by the Scottish Government or its agencies for 2019 and up to 20 October 2020, broken down by operator.

FOI/EIR not held 70 score 20 working days correspondence spending s.39(2) s.6(1) s.10(4) 2 attachments
Published
2021-03-12
Reference
FOI/202000100758
Directorate
Marine Directorate
Topic
Marine and fisheries, Public sector

Seals killed by salmon farmers since 1 January 2020: EIR release

Please provide information on seals killed (including the reporting of seals killed and any discussions on the killing of seals) by salmon farmers since 1 January 2020. Please include data, copies of licences, returns, email correspondence, letters (e.g. to NOAA), Cabinet Briefings, discussions of seals being killed an...

FOI/EIR already published 80 score 43 working days over deadline correspondence ministers briefings s.20 s.39 s.6(1) s.10(4) s.10(5) 2 attachments
Published
2021-03-10
Reference
FOI/202000118346
Directorate
Marine Directorate
Topic
Environment and climate change, Public sector

Breakdown of funding provided to Capercaillie: EIR release

How much public money has been spent on capercaillie in the last 30 years, including funds/grants from such NGOs/government bodies such as SNH/Forestry Commission etc.

FOI/EIR not held 45 score 18 working days correspondence s.20 s.39(2) s.10(4)
Published
2021-03-09
Reference
FOI/202100137040
Directorate
Environment and Forestry Directorate
Topic
Farming and rural, Money and tax, Public sector

Information relating to stopping up orders hearing: EIR release

You asked "please issue the SU-ABS-002 & -003 hearing report to me, the other participants and the public, so that we can implement action of the planning condition that has been held up pending the issue of the report."

FOI/EIR clarification 55 score 16 working days correspondence ministers s.20 s.39(2) s.10(4) s.42
Published
2021-03-09
Reference
FOI/202100137883
Directorate
Topic
Building, planning and design, Public sector, Transport

Activation of ice warning sensors Queensferry Crossing: EIR release

Between the 25th of December and 2020 and the 25th of January 2021 how many a) times and b) on what dates have the ice warning sensors been activated across the Queensferry Crossing?

FOI/EIR not held 45 score 8 working days correspondence s.20 s.39(2) s.10(4)
Published
2021-03-09
Reference
FOI/202100144616
Directorate
Topic
Environment and climate change, Public sector, Transport

Information relating to the use of hydrogen peroxide in salmon farming: EIR release

Please provide information on the use of hydrogen peroxide in salmon farming - via both wellboats, tarpaulins and any other methods - since 1 January 2016. Please include Excel spreadsheets, data, emails, letters, reports and any other information related to the use of hydrogen peroxide in salmon farming in Scotland. ...

FOI/EIR not held 45 score 37 working days over deadline correspondence ministers briefings s.20 s.39 s.10(4) s.10(5) s.9 s.6(1)
Published
2021-03-02
Reference
FOI/202000122166
Directorate
Marine Directorate
Topic
Marine and fisheries, Public sector

Scotland's percentage of Europe's offshore wind and tidal resources: EIR release

I bring to your attention Scottish Development International's statement "Scotland has 25% of Europe's offshore wind and tidal resource" made at the following URL: https://www.sdi.co.uk/keysectors/ renewable-energy-and-low-carbon Can you please provide (1) Any discussions or analysis conducted by the Scottish Governmen...

FOI/EIR cost limit 45 score 20 working days correspondence spending s.20 s.39(2) s.10(4) s.7
Published
2021-03-01
Reference
FOI/202100132049
Directorate
Marine Directorate
Topic
Environment and climate change, Marine and fisheries, Public sector

Phase 2 Marine Protected Area (MPA) meeting: EIR release

Could I please request notes from the 20 January 2020 meeting of Phase 2 MPA and PMF management measures held at NAFC Marine Centre Scalloway, Shetland, as well as any subsequent correspondence relating to the meeting or action points taken at it.

FOI/EIR partially withheld 90 score 18 working days correspondence meetings s.20 s.39(2) s.10(4) 2 attachments
Published
2021-02-25
Reference
FOI/202000107207
Directorate
Marine Directorate
Topic
Marine and fisheries, Public sector

Accident statistics for junction of Southern Upland Way and A1: EIR release

Information in relation to the A1, North of Grantshouse: "I would like to know how many accidents have occurred at and around this Junction in the past 10 years. I would also like to know the cause of these accidents. Finally I would like to know the status of the drainage on this section of the highway and also what m...

FOI/EIR not held 70 score 8 working days correspondence s.20 s.39(2) s.10(5) s.10(4) 2 attachments
Published
2021-02-24
Reference
FOI/202100134734
Directorate
Topic
Public sector, Transport