FOI/202500475330 · FOI · unclear
Copy of cycle path design that runs between Baillieston and Shawhead: FOI release
Information requested
A copy of the cycle path design the runs that between Baillieston and Shawhead that was designed and built at part of the M8/M74 improvement works.
Response
Please see Annex's A to L to this response for copies of the cycle path design that runs between Ballieston and Shawhead that was designed and built as part of the M8/M74 improvement works.