Copy of cycle path design that runs between Baillieston and Shawhead: FOI release

Published
2025-08-13
Received
2025-07-09
Responded
2025-07-18
Directorate
Topic
Public sector, Transport
Exemptions
None detected

Information requested

A copy of the cycle path design the runs that between Baillieston and Shawhead that was designed and built at part of the M8/M74 improvement works.

Response

Please see Annex's A to L to this response for copies of the cycle path design that runs between Ballieston and Shawhead that was designed and built as part of the M8/M74 improvement works.